Ordinary Discount inject molding, plastic injection molding tooling in Wellington

Ordinary Discount
 inject molding, plastic injection molding tooling in Wellington

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

Our company puts emphasis on the management, the introduction of talented personnel, and the construction of staff building, trying hard to improve the quality and liability consciousness of staff members. Our company successfully attained IS9001 Certification and European CE Certification of Ordinary Discount inject molding, plastic injection molding tooling in Wellington, We sincerely welcome overseas customers to consult for the long-term cooperation and the mutual development.We strongly believe that we can do better and better.


Quick Details

Place of Origin: Zhejiang, China (Mainland) Product Material: P20H ,718H, 2316 ,Nak80 ,S136 Mold life: 30K,50K,100K HRC: 32-48
Brand Name: none Product: auto parts mould Runner: hot or cold Payments item: half and half
Model Number: EHM12 Name:inject molding, plastic injection molding tooling
Solfware: Pro-E, UG, solide worker, CAD T1 time: 30days after drawing confirmed with both side
Shaping Mode: Plastic Injection Mould Other name: injection molding , mold dies , plastic mold machine
Mold base: LKM, ODM Guaranty: 1 year

Packaging Delivery

Packaging Details: inject molding, plastic injection molding tooling  packing: Wooden carton
Delivery Detail: 35-45 DAYS

inject molding, plastic injection molding tooling

Product Description

Specifications of  inject molding, plastic injection molding tooling:

mould material 45#,P20,H13,718,2738,NAK80,S136 etc.
mould base LKM,HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould life P20:300,000-500,000 shots
2316 718H:500,000 shots
S136 H13:700,000 shots
Design software UG,PROE,CAD etc.
Plastic material PP,PE,ABS,PC etc.
Delivery time 35-45days
Specification According to client’s requirements

1.Samples/Drawing &Requirement from you

2.Mould design:we will Communicate&Exchange the opinion with you after you place order.

3.Material Purchase:Steel cutting and Mould base tooling.

4.Assembling.

5.Inspection of mould : following and controlling the tooling processing.

6.Mould testing:We will inform you the date.Than will send the sample’s inspection report&injection parameters with the sample to you!

7.Your instruction &confirmation for shipment.

8.Ready made mould before packing.

Package of  injection molding :

1. Wooden carton ,

2. shipping by sea ,by load ,

3. We also can produce any plastic parts for you . We have 25 different ton injection machine .

Pictures of inject molding, plastic injection molding tooling:

A (22) A (21) A (20)

Company Information

1.  Office corner
office corner

2.  Equipments
Equipments
3.Working place

Working place

4.  Package and delivering
package and delivering

5. Certification

俄罗斯认证证书 (1) WRAS ISO14001 ISO9001

6. Our customer
Our customer

 

FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service

1. How about your payments item ?
Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery).
2. Delivering time ?
Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering .
3. Ability of producing ?
We have all tooling machine for making molds, we can provide 30-50 sets of molds every month .

inject molding, plastic injection molding tooling

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405




  • If you have a well and your footvalve fails it is possible to get around this in certain situations.Thanks for watching and please subscribe! Al



    Finally finished the install changed out the old T fitting with a new one and also added other ball valve to cut off the water to the fountain piping to keep the head pressure on the hard piping. Thanks for watching. Don’t forget to scribe and press like.

    Related Products

    WhatsApp Online Chat !