Factory provide nice price injection molding manufacturing, molds for injection molding Factory in USA

Factory provide nice price
 injection molding manufacturing, molds for injection molding Factory in USA

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

continue to improve, to ensure product quality in line with market and customer standard requirements. Our company has a quality assurance system have been established for Factory provide nice price injection molding manufacturing, molds for injection molding Factory in USA, We will wholeheartedly welcome all clients in the industry both at home and abroad to cooperate hand in hand, and create a bright future together.


Quick Details

Place of Origin: Zhejiang, China (Mainland) Product Material: P20H ,718H, 2316 ,Nak80 ,S136 Mold life: 30K,50K,100K HRC: 32-48
Brand Name: none Product: auto parts mould Runner: hot or cold Payments item: half and half
Model Number: EHM09 Name:injection molding manufacturing, molds for injection molding
Solfware: Pro-E, UG, solide worker, CAD T1 time: 30days after drawing confirmed with both side
Shaping Mode: Plastic Injection Mould Other name: injection molding , mold dies , plastic mold machine
Mold base: LKM, ODM Guaranty: 1 year

Packaging Delivery

Packaging Details: injection molding manufacturing, molds for injection molding  packing: Wooden carton
Delivery Detail: 35-45 DAYS

injection molding manufacturing, molds for injection molding

Product Description

Specifications of  injection molding manufacturing, molds for injection molding:

mould material 45#,P20,H13,718,2738,NAK80,S136 etc.
mould base LKM,HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould life P20:300,000-500,000 shots
2316 718H:500,000 shots
S136 H13:700,000 shots
Design software UG,PROE,CAD etc.
Plastic material PP,PE,ABS,PC etc.
Delivery time 35-45days
Specification According to client’s requirements

1.Samples/Drawing &Requirement from you

2.Mould design:we will Communicate&Exchange the opinion with you after you place order.

3.Material Purchase:Steel cutting and Mould base tooling.

4.Assembling.

5.Inspection of mould : following and controlling the tooling processing.

6.Mould testing:We will inform you the date.Than will send the sample’s inspection report&injection parameters with the sample to you!

7.Your instruction &confirmation for shipment.

8.Ready made mould before packing.

Package of  injection molding :

1. Wooden carton ,

2. shipping by sea ,by load ,

3. We also can produce any plastic parts for you . We have 25 different ton injection machine .

Pictures of injection molding manufacturing, molds for injection molding:

A (19) A (18) A (17) A (16)

Company Information

1.  Office corner
office corner

2.  Equipments
Equipments
3.Working place

Working place

4.  Package and delivering
package and delivering

5. Certification

俄罗斯认证证书 (1) WRAS ISO14001 ISO9001

6. Our customer
Our customer

 

FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service

1. How about your payments item ?
Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery).
2. Delivering time ?
Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering .
3. Ability of producing ?
We have all tooling machine for making molds, we can provide 30-50 sets of molds every month .

injection molding manufacturing, molds for injection molding

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405




  • Here is another easy way to disconnect the EGR system from the Nissan VG33E Engine Intake Plenum Manifold. Has part of removing the intake plenum removal, here is a easy and best way to ease manifold removal.



    Watch Harry’s Hot Tapper wet tap into a live pressurized water line. This hot tap was performed by an actual B&S Products Co. customer at a job site. Our Wet Tapping Machine makes branch connections under pressure in any copper, steel, concrete, asbestos pipe, PVC, black pipe main line size with branch sizes 3/4 inch to 4 inches. With our hot tap machine there’s no need for pipe freezing, shutting down the line, draining the line or refilling the system. For more information visit us online at www.bs-products.com or call us at 800-424-6882

    Related Products

    WhatsApp Online Chat !