Good quality 100% injection molding in china, daily necessities moulds, fork knife molding Factory for Sydney

Good quality 100% injection molding in china, daily necessities moulds, fork knife molding Factory for Sydney

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

"Quality first, Honesty as base, Sincere service and mutual profit" is our idea, in order to develop continuously and pursue the excellence for Good quality 100% injection molding in china, daily necessities moulds, fork knife molding Factory for Sydney, we are now looking forward to even greater cooperation with overseas customers based on mutual benefits. If you are interested in any of our products, please feel free to contact us for more details.


Quick Details

Place of Origin: Zhejiang, China (Mainland) Product Material: P20H ,718H, 2316 ,Nak80 ,S136 Mold life: 500000 HRC: 32-48
Brand Name: none Product: Household mould Runner: hot or cold Payments item: half and half
Model Number: EHMH05 Name:injection molding in china, daily necessities moulds, fork knife molding Solfware: Pro-E, UG, solide worker, CAD T1 time: 30days after drawing confirmed with both side
Shaping Mode: Plastic Injection Mould Other name: household mold type , chair , container, fox Mold base: LKM, ODM Guaranty: 1 year

Packaging Delivery

Packaging Details: injection molding in china, daily necessities moulds, fork knife molding packing: Wooden carton
Delivery Detail: 35-45 DAYS

injection molding in china, daily necessities moulds, fork knife molding

Product Description

Specifications of injection molding in china, daily necessities moulds, fork knife molding:

mould material 45#,P20,H13,718,2738,NAK80,S136 etc.
mould base LKM,HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould life P20:300,000-500,000 shots
2316 718H:500,000 shots
S136 H13:700,000 shots
Design software UG,PROE,CAD etc.
Plastic material PP,PE,ABS,PC etc.
Delivery time 35-45days
Specification According to client’s requirements

1.Samples/Drawing &Requirement from you

2.Mould design:we will Communicate&Exchange the opinion with you after you place order.

3.Material Purchase:Steel cutting and Mould base tooling.

4.Assembling.

5.Inspection of mould : following and controlling the tooling processing.

6.Mould testing:We will inform you the date.Than will send the sample’s inspection report&injection parameters with the sample to you!

7.Your instruction &confirmation for shipment.

8.Ready made mould before packing.

Pictures of good feedback plastic Glasses mould:

Packaging Shipping

Package of good feedback plastic Glasses mould:

1. Wooden carton ,

2. shipping by sea ,by load ,

3. We also can produce any plastic parts for you . We have 25 different ton injection machine .

Pictures of injection molding in china, daily necessities moulds, fork knife molding:

H (11) H (9) H (8)

Company Information

1.  Office corner
office corner

2.  Equipments
Equipments
3.Working place

Working place

4.  Package and delivering
package and delivering

5. Certification

俄罗斯认证证书 (1) WRAS ISO14001 ISO9001

6. Our customer
Our customer

 

FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service

 

 

1. How about your payments item ?

Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery).

 

2. Delivering time ?

Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering .

 

3. Ability of producing ?

We have all tooling machine for making molds, we can provide 30-50 sets of molds every month .

 injection molding in china, daily necessities moulds, fork knife molding

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405




  • Lee Fluid Transfer – Sanitary Diverter Ball Valve. 3A Sanitary Certified design and style and meets USDA requirements. For much more facts, speak to Lee Fluid Transfer at income@leeind.com or 814.342.0461. Stop by www.leeind.com



    [https://www.indiamart.com/hakimiindustrialstores/ ] Based at Kolkata , West Bengal, India,in 2000, “Hakimi Industrial Stores” are one of the leading manufacturers, supplier, distributor, wholesaler, trader, dealer and stockist of Ball Valve, Butterfly Valve, Gate Valve, Gate Valve, Buttweld Fittings, Forged Steel Pipe Fittings, Cast Iron Valve, Pulp Valve, Steam Trap and many more products. Further, being in the industry for several years, we have carved a niche in this domain and constantly upgrade our gamut in terms of performance and efficiency.

    Related Products

    WhatsApp Online Chat !