2016 Super Lowest Price tpu injection molding Manufacturer in Poland

2016 Super Lowest Price tpu injection molding Manufacturer in Poland

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

We support our buyers with ideal high quality products and high level service. Becoming the specialist manufacturer in this sector, we have gained rich practical experience in producing and managing for 2016 Super Lowest Price tpu injection molding Manufacturer in Poland, we are seeking for extensive cooperation with honest customers, achieving a new cause of glory with customers and strategic partners.


Quick Details

Place of Origin: Zhejiang, China (Mainland) Product Material: P20H ,718H, 2316 ,Nak80 ,S136 Mold life: 30K,50K,100K HRC: 32-48
Brand Name: none Product: auto parts mould Runner: hot or cold Payments item: half and half
Model Number: EHM14 Name:tpu injection molding
Solfware: Pro-E, UG, solide worker, CAD T1 time: 30days after drawing confirmed with both side
Shaping Mode: Plastic Injection Mould Other name: injection molding , mold dies , plastic mold machine
Mold base: LKM, ODM Guaranty: 1 year

Packaging Delivery

Packaging Details: tpu injection molding  packing: Wooden carton
Delivery Detail: 35-45 DAYS

tpu injection molding

Product Description

Specifications of  tpu injection molding:

mould material 45#,P20,H13,718,2738,NAK80,S136 etc.
mould base LKM,HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould life P20:300,000-500,000 shots
2316 718H:500,000 shots
S136 H13:700,000 shots
Design software UG,PROE,CAD etc.
Plastic material PP,PE,ABS,PC etc.
Delivery time 35-45days
Specification According to client’s requirements

1.Samples/Drawing &Requirement from you

2.Mould design:we will Communicate&Exchange the opinion with you after you place order.

3.Material Purchase:Steel cutting and Mould base tooling.

4.Assembling.

5.Inspection of mould : following and controlling the tooling processing.

6.Mould testing:We will inform you the date.Than will send the sample’s inspection report&injection parameters with the sample to you!

7.Your instruction &confirmation for shipment.

8.Ready made mould before packing.

Package of  injection molding :

1. Wooden carton ,

2. shipping by sea ,by load ,

3. We also can produce any plastic parts for you . We have 25 different ton injection machine .

Pictures of tpu injection molding:

A (143) A (142) A (141) A (140)

Company Information

1.  Office corner
office corner

2.  Equipments
Equipments
3.Working place

Working place

4.  Package and delivering
package and delivering

5. Certification

俄罗斯认证证书 (1) WRAS ISO14001 ISO9001

6. Our customer
Our customer

 

FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service

1. How about your payments item ?
Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery).
2. Delivering time ?
Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering .
3. Ability of producing ?
We have all tooling machine for making molds, we can provide 30-50 sets of molds every month .

tpu injection molding

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405




  • Subscribe and visit our weekly podcast for more tips https://itunes.apple.com/us/podcast/fix-it-home-improvement/id880903087?mt=2

    The Mansfield flush valve is a unique style. The valve seal is part of the overflow pipe. To repair a leaking toilet, you must take off the refill tube, unscrew the top cap and remove the overflow pipe. You can now get to the valve seal. By pulling at the seal from the side, you can pull it out of the body of the flush valve. To put in a new seal, you need to position it into the top groove on the flush valve.

    The Mansfield 210 and 211 flush valve can have a chain attached to the bottom of the overflow tube or the handle passing through the plastic loop on the top of the tower. Both styles use the same rubber seal.



    Texas Process Technologies U.S.

    https://texasprocesstechnologies.com

    We are dedicated to manufacturing and selling national and imported sanitary stainless steel process equipment and components for the Dairy, Food, Pharmaceutical, Beverage, and Biotechnology industries.

    The hidden truth about sanitary ball valves

    Related Products

    WhatsApp Online Chat !