Wholesale Price China Homeholds mould Manufacturer in Washington

Wholesale Price China Homeholds mould Manufacturer in Washington

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

Our development depends on the advanced equipment, excellent talents and continuously strengthened technology forces. Wholesale Price China Homeholds mould Manufacturer in Washington, We will wholeheartedly welcome all clients in the industry both at home and abroad to cooperate hand in hand, and create a bright future together.


Product Detail

Quick Details

Place of Origin: Zhejiang, China (Mainland) Product Material: P20H, 718H, 2316, Nak80, S136 Mold life: 30K, 50K, 100K HRC: 32-48
Brand Name: none Product: homeholds mould Runner: hot or cold Payments item: half and half
Model Number: EHMH27 Name: vertical plastic injection molding machine Software: Pro-E, UG, regular worker, CAD T1 time: 30days after drawing confirmed
Shaping Mode: Plastic Injection Mould Other name: household mold type, chair, container, fox Mold base: LKM, ODM Guaranty: 1 year

 

Packaging Delivery

Packaging Details Wooden carton
Delivery Details 35-45 DAYS

 

vertical plastic injection molding machine

Product Description

Specifications of vertical plastic injection molding machine:

mould material 45#, P20, H13, 718, 2738, NAK80, S136 etc.
mould base LKM, HASCO etc.
Cavity Single/multi
Mould life P20: 300,000-500,000 shots    2316 718H: 500,000 shots     S136 H13: 700,000 shots
Design software UG, PROE, CAD etc.
Plastic material PP, PE, ABS, PC etc.
Delivery time 35-45 days
Specification According to client’s requirements

1. Samples/drawing&requirement from you

2. Mould design: we will communicate and exchange the opinion with you after you place order.

3. Material Purchase: Steel cutting and mould base tooling.

4. Assembling.

5. Inspection of mould: following and controlling the tooling processing.

6. Mould testing: We will inform you the date. Then will send the sample’s inspection report and injection parameters with the sample to you!

7. Your instruction&confirmation for shipment.

8. Ready-made mould before packing.

Package of injection molding:

1. Wooden carton,

2. shipping by sea, by load,

3. We also can produce any plastic parts for you. We have 25 different ton injection machines.

Pictures of vertical plastic injection molding machine:

201918

Company Information

1. Office corner

办公室

2. Equipment

 EquipmentsEquipments

3. Working place

 

 

Working-place

4. Package and delivering

package-and-delivering

5. Certification

1-61-71-81-91-9

6. Our customers

 

 

1-10

FAQ

Why choose us?

Prompt response in 24 hours
Good Quality
Reasonable price
Stronger engineer team Support R&D
Good After-sale service

 

 

How about your payments item?
Payment Item: 50% deposit after confirming the drawings and 50% balance after confirming the samples (before delivery).

 

Delivering time?
Generally, T1 time is 30 days after drawings confirmed both side, then the samples approved, 5 days later it can be delivering.

 

Ability of producing?
We have all tooling machine for making molds. We can provide 30-50 sets of molds every month.

 

Welcome to visit us!

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405




  • https://www.hartmann-valves.com // Christian and Werner Hartmann, the grandsons of the company founder, provide an interesting insight into the production processes and company philosophy of the valve and wellhead manufacturer.

    Since more than 70 years special ball valves and customized wellheads for extreme process conditions are designed and manufactured at the two German Hartmann facilities in Celle and Burgdorf.

    Disclosing the secret of zero bubble tightness, decades lifetime and seamless traceability, the film shows how the production of Hartmann’s made in Germany solutions differs from standard products: from tailor-made designs with 3D simulations, via the manual ball lapping and assembling process to testing facilities designed to meet maximum quality requirements of the high performance components.



    https://www.homeownerseries.com

    This is video #2 of a 3-part series. The videos are:

    Part 1 = https://youtu.be/8xlJXrSK3ag?hd=1
    Part 2 = https://youtu.be/BLDvTRZlyCo?hd=1
    Part Overview = https://youtu.be/KCPlbiTcLc4?hd=1

    To watch the Flush Valve Playlist = https://www.youtube.com/view_play_list?p=31C570921B83280C

    Flush Valve

    Replacement

    Before beginning this repair shut off the water supply, remove the lid to the tank, and flush the toilet. Once the tank is mostly empty, sponge out the rest of the water draining it into the toilet’s bowl. With the tank empty, position a plastic container to collect water under the water supply hose and unscrew the hose from the base of the tank, having any water drain into the plastic container below. To remove the tank, its mounting bolts will need to first be unscrewed.

    Using the flat head screwdriver to hold the head of the bolt, and an adjustable open-ended wrench to loosen the nut remove all of the tank mounting bolts. If the bolts are corroded and too difficult to unscrew, cut through them with a mini-hacksaw. When the bolts are free lift the tank off of the base and place it into the cement-mixing tub.

    With the tank on its side peel off the sponge gasket reveling the lock nut. While holding onto the flush valve assembly inside the tank, unscrew the lock nut from the base of the tank using a pair of rib-joint pliers.
    With the assembly disconnected from the tank unhook the chain from the flush handle, and remove the old flush valve assembly. Take the new flush valve assembly insuring that its seal is in place, and insert it into the tank of the toilet with the overflow tube at the ten o’clock position. Then place the external seal on the flush valve and hand-tighten the lock nut. Finally tighten the lock nut with rib-joint pliers and affix the sponge gasket over the lock nut. Reattach the flapper valve to the overflow tube and the chain to the flush lever.

    Insert the tank mounting bolts with washers back through the openings in the base of the tank, once they are in place set the tank back on the base of the toilet lining up the mounting bolts with their corresponding openings in the toilet’s bowl. Hand tighten the lock nuts on the mounting bolts and finish off using the screwdriver and socket wrench to secure the bolts water tight with no movement between the tank and the base.

    Now that the tank is re-installed the mounting bolts depending on personal preference, may be trimmed within a quarter inch from the lock nut, using a mini hacksaw. Reattach the water supply hose and turn on the water supply valve. The tank should begin to fill. As the tank fills inspect the joint between the base and the tank for any leaking. Once the tank is full make any adjustment to the overflow tube, flush valve and tank fill valve for optimum water level. With all adjustments complete test cycle the toilet and replace the toilet’s tank lid.

    Related Products

    WhatsApp Online Chat !