Wholesale price for injection molding in china, daily necessities moulds, fork knife molding Factory for Jersey

Wholesale price for
 injection molding in china, daily necessities moulds, fork knife molding Factory for Jersey

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

Our company insists all along the quality policy of "product quality is base of enterprise survival; customer satisfaction is the staring point and ending of an enterprise; persistent improvement is eternal pursuit of staff" and the consistent purpose of "reputation first, customer first" for Wholesale price for injection molding in china, daily necessities moulds, fork knife molding Factory for Jersey, If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients around the world in the near future.


Quick Details

Place of Origin: Zhejiang, China (Mainland) Product Material: P20H ,718H, 2316 ,Nak80 ,S136 Mold life: 500000 HRC: 32-48
Brand Name: none Product: Household mould Runner: hot or cold Payments item: half and half
Model Number: EHMH05 Name:injection molding in china, daily necessities moulds, fork knife molding Solfware: Pro-E, UG, solide worker, CAD T1 time: 30days after drawing confirmed with both side
Shaping Mode: Plastic Injection Mould Other name: household mold type , chair , container, fox Mold base: LKM, ODM Guaranty: 1 year

Packaging Delivery

Packaging Details: injection molding in china, daily necessities moulds, fork knife molding packing: Wooden carton
Delivery Detail: 35-45 DAYS

injection molding in china, daily necessities moulds, fork knife molding

Product Description

Specifications of injection molding in china, daily necessities moulds, fork knife molding:

mould material 45#,P20,H13,718,2738,NAK80,S136 etc.
mould base LKM,HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould life P20:300,000-500,000 shots
2316 718H:500,000 shots
S136 H13:700,000 shots
Design software UG,PROE,CAD etc.
Plastic material PP,PE,ABS,PC etc.
Delivery time 35-45days
Specification According to client’s requirements

1.Samples/Drawing &Requirement from you

2.Mould design:we will Communicate&Exchange the opinion with you after you place order.

3.Material Purchase:Steel cutting and Mould base tooling.

4.Assembling.

5.Inspection of mould : following and controlling the tooling processing.

6.Mould testing:We will inform you the date.Than will send the sample’s inspection report&injection parameters with the sample to you!

7.Your instruction &confirmation for shipment.

8.Ready made mould before packing.

Pictures of good feedback plastic Glasses mould:

Packaging Shipping

Package of good feedback plastic Glasses mould:

1. Wooden carton ,

2. shipping by sea ,by load ,

3. We also can produce any plastic parts for you . We have 25 different ton injection machine .

Pictures of injection molding in china, daily necessities moulds, fork knife molding:

H (11) H (9) H (8)

Company Information

1.  Office corner
office corner

2.  Equipments
Equipments
3.Working place

Working place

4.  Package and delivering
package and delivering

5. Certification

俄罗斯认证证书 (1) WRAS ISO14001 ISO9001

6. Our customer
Our customer

 

FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service

 

 

1. How about your payments item ?

Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery).

 

2. Delivering time ?

Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering .

 

3. Ability of producing ?

We have all tooling machine for making molds, we can provide 30-50 sets of molds every month .

 injection molding in china, daily necessities moulds, fork knife molding

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405




  • Super Industrial Lining Pvt. Ltd are prominent PFA Lined Ball Valves Manufacturers, Supplier and Exporter of PFA Lined Ball Valves, PFA Lined Valve based in Gujarat, India.

    https://www.silcindia.net/pfa-lined-globe-valves-2721920.html



    The current status of my corolla CE, after I posted the video back in 2013 about installing my radio and some leds. I’ve done many things since then:

    NOT shown on video: •Megan Racing lower middle bar. •Ultra Racing rear strut bar

    •TRD Front strut bar
    •OEM rear bumper cover
    •LEDs everywhere replacing the yellow bulbs, including shift selector and those in rear view mirror.
    •Dash cover
    • Window visors
    •Full THULE roof rack
    •Corolla LE Chrome accents (e-brake & A/C vent tips)
    •Corolla LE dual compartment arm rest (from a 2003 LE)
    •Chrome door handles (will buy OEM ones soon)
    •Corolla LE/S tweeters & tweeter covers (from a 2004 LE)
    •2005-2008 Corolla LE cluster (from a 2005)
    •Corolla LE woodgrain console and switches (from a 2007)
    •Corolla LE/S rear view mirror (from a 2005 LE)
    •Intermitent wiper switch (from a 2004 LE)
    •eBay foglight kit (holding up good until now)
    •Hikaru 6000k HIDs on fogs and low beams.
    •Still rocking the blue halogen bulbs on the high beams, the same ones from the 2013 video.
    •Sickspeed black socks on PS and brake reservoirs and intake mani (for looks)
    •Engine cover is from a 2002 celica, with Synth Oil only (car has been synthetic since 100k miles, it has 130k)
    •Big 3 Upgrade
    •Fumoto valve for easier oil changes
    •Alternator, starter, engine mounts, cv and ball joints, and exhaust maintenance has been done.
    •AEM drop in filter
    •Pyle alarm with starter disable and trunk opener.
    •Steering wheel toyota logo replaced since it was scratched.
    •TRD seat belt covers (Given to me for free by a friend, another toyota enthusiast)

    Plans:

    •03-04 1ZZ-FE supercharger (will take some hunting to do)
    •DC sports headers w/ Magnaflow high flow converter.
    •2ZZ water pump
    •MWR water pump and alternator pulleys.
    •Lightweight crankshaft pulley (1ZZ engine is internally balanced, no need for heavy stock pulley.)
    •Tokico Blue shocks or KYB shocks.
    •Poly bushings in control arm and rear axle beam.
    •I already have Tein H tech springs I haven’t installed yet.
    •I have 2005 Celica GT-S wheels I will be installing soon.

    May 17-23, 2017: repainted my rear bumper with spray can, and last using rust oleum clear coat, pretty amazed for a spraycan job, bumper was dull and scratched.

    ° All of the things I mentioned on the car, done by myself completely.

    Related Products

    WhatsApp Online Chat !