Quality Inspection for injection molded plastic parts manufacturers, pipe fitting mould Supply to Plymouth

Quality Inspection for
 injection molded plastic parts manufacturers, pipe fitting mould Supply to Plymouth

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

In the past few years, our company absorbed and digested advanced technologies both at home and abroad. Meanwhile, our company staffs a team of experts devoted to the development of Quality Inspection for injection molded plastic parts manufacturers, pipe fitting mould Supply to Plymouth, We fully welcome customers from all over the world to establish stable and mutually beneficial business relationships, to have a bright future together.


Quick Details

Place of Origin: Zhejiang, China (Mainland) Mold life: 500000 , 1000000
Brand Name: none Runner: hot or cold
Model Number: EHMF21 Solfware: Pro-E, UG, solide worker, CAD
Shaping Mode: Plastic Injection Mould Mold base: LKM, ODM
Product Material: P20H ,718H, 2316 ,Nak80 ,S136 HRC: 32-48
Product:  pipe fittings Payments item: half and half
Name:injection molded plastic parts manufacture, pipe fitting mould T1 time: 30days after drawing confirmed with both side
Other name: fittings molding , pipe fittings mould , plastic injection molding Guaranty: 1 year

Packaging Delivery

Packaging Details: injection molded products, PPR pipe fitting mold, coupling, elbow : Wooden carton

injection molded products, PPR pipe fitting mold, coupling, elbow

Packaging Shipping:  polybag,color box,carton
injection molded plastic parts manufacture, pipe fitting mould

Pictures of pvc pipe fitting injection plastic mould :

F (15)F (14)F (13)F (12)

Product Description

Specifications ofinjection molded plastic parts manufacture, pipe fitting mould :

mould material 45#,P20,H13,718,2738,NAK80,S136 etc.
mould base LKM,HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould life P20:300,000-500,000 shots
2316 718H:500,000 shots
S136 H13:700,000 shots
Design software UG,PROE,CAD etc.
Plastic material PP,PE,ABS,PC etc.
Delivery time 35-45days
Specification According to client’s requirements

1.Samples/Drawing &Requirement from you

2.Mould design:we will Communicate&Exchange the opinion with you after you place order.

3.Material Purchase:Steel cutting and Mould base tooling.

4.Assembling.

5.Inspection of mould : following and controlling the tooling processing.

6. Mould testing:We will inform you the date.Than will send the sample’s inspection report&injection parameters with the sample to you!

7.Your instruction &confirmation for shipment.

8.Ready made mould before packing.

Package of pvc pipe fitting injection plastic mould :

1. Wooden carton ,

2. shipping by sea ,by load ,

3. We also can produce any plastic parts for you . We have 25 different ton injection machin

1.  Office corner
office corner

2.  Equipments
Equipments
3.Working place

Working place

4.  Package and delivering
package and delivering

5. Certification

俄罗斯认证证书 (1) WRAS ISO14001 ISO9001

6. Our customer
Our customer

 

FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service

 

1. How about your payments item ?

Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery).

2. Delivering time ?

Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering .

3. Ability of producing ?

We have all tooling machine for making molds, we can provide 30-50 sets of injection plastic mould every month .

injection molded products, PPR pipe fitting mold, coupling, elbow

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405




  • If your toilet isn’t flushing but the cistern fills with water then the most likely problem is the plastic flap inside the siphon has broken so no suction pressure is generated. This video shows how to replace the plastic to get the toilet flushing again as normal. Best of all there is zero cost, the parts required are available around the house for nothing.

    I’m not a plumber so any work you do is at your own risk – I repaired this toilet using basic instructions that needed very little effort or knowledge and no cost to me other than my time



    Ball Grinding Machine Video

    Related Products

    WhatsApp Online Chat !