Professional China Homeholds mould Supply to Moldova

Professional China 
 Homeholds mould Supply to Moldova

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

With our excellent management, strong technical capability and strict quality control system, we continue to provide our clients with reliable quality, reasonable prices and excellent services. We aim at becoming one of your most reliable partners and earning your satisfaction for Professional China Homeholds mould Supply to Moldova, winning customers' trust is the gold key to our success! If you are interested in our products, please feel free to visit our web site or contact us.


Product Detail

Quick Details

Place of Origin: Zhejiang, China (Mainland) Product Material: P20H, 718H, 2316, Nak80, S136 Mold life: 30K, 50K, 100K HRC: 32-48
Brand Name: none Product: homeholds mould Runner: hot or cold Payments item: half and half
Model Number: EHMH22 Name: vertical plastic injection molding machine Software: Pro-E, UG, regular worker, CAD T1 time: 30days after drawing confirmed
Shaping Mode: Plastic Injection Mould Other name: household mold type, chair, container, fox Mold base: LKM, ODM Guaranty: 1 year

 

Packaging Delivery

Packaging Details Wooden carton
Delivery Details 35-45 DAYS

 

vertical plastic injection molding machine

Product Description

Specifications of vertical plastic injection molding machine:

mould material 45#, P20, H13, 718, 2738, NAK80, S136 etc.
mould base LKM, HASCO etc.
Cavity Single/multi
Mould life P20: 300,000-500,000 shots    2316 718H: 500,000 shots     S136 H13: 700,000 shots
Design software UG, PROE, CAD etc.
Plastic material PP, PE, ABS, PC etc.
Delivery time 35-45 days
Specification According to client’s requirements

1. Samples/drawing&requirement from you

2. Mould design: we will communicate and exchange the opinion with you after you place order.

3. Material Purchase: Steel cutting and mould base tooling.

4. Assembling.

5. Inspection of mould: following and controlling the tooling processing.

6. Mould testing: We will inform you the date. Then will send the sample’s inspection report and injection parameters with the sample to you!

7. Your instruction&confirmation for shipment.

8. Ready-made mould before packing.

Package of injection molding:

1. Wooden carton,

2. shipping by sea, by load,

3. We also can produce any plastic parts for you. We have 25 different ton injection machines.

Pictures of vertical plastic injection molding machine:

151413

Company Information

1. Office corner

办公室

2. Equipment

 EquipmentsEquipments

3. Working place

 

 

Working-place

4. Package and delivering

package-and-delivering

5. Certification

1-61-71-81-91-9

6. Our customers

 

 

1-10

FAQ

Why choose us?

Prompt response in 24 hours
Good Quality
Reasonable price
Stronger engineer team Support R&D
Good After-sale service

 

 

How about your payments item?
Payment Item: 50% deposit after confirming the drawings and 50% balance after confirming the samples (before delivery).

 

Delivering time?
Generally, T1 time is 30 days after drawings confirmed both side, then the samples approved, 5 days later it can be delivering.

 

Ability of producing?
We have all tooling machine for making molds. We can provide 30-50 sets of molds every month.

 

Welcome to visit us!

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405




  • Here is another easy way to disconnect the EGR system from the Nissan VG33E Engine Intake Plenum Manifold. Has part of removing the intake plenum removal, here is a easy and best way to ease manifold removal.



    Finally finished the install changed out the old T fitting with a new one and also added other ball valve to cut off the water to the fountain piping to keep the head pressure on the hard piping. Thanks for watching. Don’t forget to scribe and press like.

    Related Products

    WhatsApp Online Chat !