Hot New Products Economic new products HDPE pipe extrusion pipe machine Burundi

Hot New Products
 Economic new products HDPE pipe extrusion pipe machine Burundi

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

Assume full responsibility to meet all demands of our clients; achieve continuous advancements by promoting the growth of our clients; become the final permanent cooperative partner of clients and maximize the interests of clients for Hot New Products Economic new products HDPE pipe extrusion pipe machine Burundi, sincerely look forward to serving you in the near future. You are sincerely welcome to visit our company to talk business face to face with each other and establish long-term co-operation with us!


Quick Details

 Modle size Extruder Max.Output(kg/h) Total Power(KW) Extrusion line length(m)
KRPE-32 Φ4-32 KRSJ45/30
KRSJ25/25
30-120 45 28
KRPE-63 Φ20-63 KRSJ60/33
KRSJ25/25
120-220 100 36
KRPE-110 Φ20-110 KRSJ65/33
KRSJ25/25
150-250 120 39
KRPE-160 Φ63-160 KRSJ65/33
KRSJ25/25
120-270 150 43
KRPE-250 Φ75-250 KRSJ75/33
KRSJ25/25
280-400 230 45
KRPE-315 Φ110-315 KRSJ90/33
KRSJ25/25
450-550 330 63
KRPE-450 Φ160-450 KRSJ90/33
KRSJ25/25
450-600 350 65
KRPE-630 Φ315-630 KRSJ120/33
KRSJ25/25
700-950 550 75
KRPE-800 Φ400-800 KRSJ90/33
KRSJ90/33
800-1200 700 75
KRPE-1200 Φ710-1200 KRSJ90/33
KRSJ120/33
1200-1500 1100 78
KRPE-1600 Φ800-1600 KRSJ120/33
KRSJ120/33
1500-1700 1300 85
KRPE-2000 Φ1600-2000 KRSJ120/33
KRSJ120/33
1500-1800 1300 88
KRPE-2400 Φ2000-2400 KRSJ150/33
KRSJ150/33
200-3500 1600 90

Packaging Delivery

Packaging Details: Wooden carton
Delivery Detail: 35-45 DAYS

Pictures of  HDPE pipe extrusion pipe machine:

 b3 b5 b4

Packaging Shipping

1. Wooden carton ,

2. shipping by sea ,by load ,

3. We also can produce any requirements from customer. We can provide good solution for you.

1.  Office corner
office corner

2.  Producing and inspection
Equipments

3.  Package and delivering
Producing & delivering

4 . Certification

俄罗斯认证证书 (1) WRAS ISO14001 ISO9001

5. Our customer
Our customer

FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service

 

1. How about your payments item ?

Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery).
2. Delivering time ?
Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering .
3. Ability of producing ?
We have all tooling machine for making molds, we can provide 30-50 sets of molds every month .

Economic new products HDPE pipe extrusion pipe machine!

Welcome to visit us!!!

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405




  • Email: floratongda@outlook.com Cell& whatsapp: 0086 13915 72 8822 Skype: chilateflora



    Subscribe and visit our weekly podcast for more tips https://itunes.apple.com/us/podcast/fix-it-home-improvement/id880903087?mt=2

    The Mansfield flush valve is a unique style. The valve seal is part of the overflow pipe. To repair a leaking toilet, you must take off the refill tube, unscrew the top cap and remove the overflow pipe. You can now get to the valve seal. By pulling at the seal from the side, you can pull it out of the body of the flush valve. To put in a new seal, you need to position it into the top groove on the flush valve.

    The Mansfield 210 and 211 flush valve can have a chain attached to the bottom of the overflow tube or the handle passing through the plastic loop on the top of the tower. Both styles use the same rubber seal.

    Related Products

    WhatsApp Online Chat !