High Performance extrusion lines Manufacturer in Bolivia

High Performance 
 extrusion lines   Manufacturer in Bolivia

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

Our products are widely recognized and trusted by users and can meet continuously developing economic and social needs for High Performance extrusion lines Manufacturer in Bolivia, We cordially welcome customers from at home and abroad to join us and cooperate with us to enjoy a better future.


Quick Details

 Modle size Extruder Max.Output(kg/h) Total Power(KW) Extrusion line length(m)
KRPE-32 Φ4-32 KRSJ45/30
KRSJ25/25
30-120 45 28
KRPE-63 Φ20-63 KRSJ60/33
KRSJ25/25
120-220 100 36
KRPE-110 Φ20-110 KRSJ65/33
KRSJ25/25
150-250 120 39
KRPE-160 Φ63-160 KRSJ65/33
KRSJ25/25
120-270 150 43
KRPE-250 Φ75-250 KRSJ75/33
KRSJ25/25
280-400 230 45
KRPE-315 Φ110-315 KRSJ90/33
KRSJ25/25
450-550 330 63
KRPE-450 Φ160-450 KRSJ90/33
KRSJ25/25
450-600 350 65
KRPE-630 Φ315-630 KRSJ120/33
KRSJ25/25
700-950 550 75
KRPE-800 Φ400-800 KRSJ90/33
KRSJ90/33
800-1200 700 75
KRPE-1200 Φ710-1200 KRSJ90/33
KRSJ120/33
1200-1500 1100 78
KRPE-1600 Φ800-1600 KRSJ120/33
KRSJ120/33
1500-1700 1300 85
KRPE-2000 Φ1600-2000 KRSJ120/33
KRSJ120/33
1500-1800 1300 88
KRPE-2400 Φ2000-2400 KRSJ150/33
KRSJ150/33
200-3500 1600 90

Packaging Delivery

Packaging Details: Wooden carton
Delivery Detail: 35-45 DAYS

Pictures of  extrusion lines:

   b29 b34 b32 b6 b4

Packaging Shipping

1. Wooden carton ,

2. shipping by sea ,by load ,

3. We also can produce any requirements from customer. We can provide good solution for you.

1.  Office corner
office corner

2.  Producing and inspection
Equipments

3.  Package and delivering
Producing & delivering

4 . Certification

俄罗斯认证证书 (1) WRAS ISO14001 ISO9001

5. Our customer
Our customer

FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service

 

1. How about your payments item ?

Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery).
2. Delivering time ?
Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering .
3. Ability of producing ?
We have all tooling machine for making molds, we can provide 30-50 sets of molds every month .

extrusion lines!

Welcome to visit us!!!

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405


  •  

    A friend has what I think is a damaged sandpoint screen and as a result his pump is sucking sand out of the ground. This isn’t that big of deal, normally the well cleans the sand out quickly and stops… but his isn’t. This is the prototype of an idea for a pressurized sand trap that he can place in front of his filter to catch the majority of the sediment and hopefully stop plugging sprinkler heads.

    PVC round compact ball valve



    Ball Grinding Machine Video

    Related Products

    WhatsApp Online Chat !