5 Years Factory Homeholds mould Abu Dhabi

5 Years Factory
 Homeholds mould Abu Dhabi

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

We always stick to the principle "Quality First, Prestige Supreme". We are fully committed to providing our clients with competitively priced quality products, prompt delivery and professional service for 5 Years Factory Homeholds mould Abu Dhabi, welcomes all overseas friends and merchants to establish collaboration with us. We will provide you with honest, high quality and efficient service to meet your requirements.


Product Detail

Quick Details

Place of Origin: Zhejiang, China (Mainland) Product Material: P20H, 718H, 2316, Nak80, S136 Mold life: 30K, 50K, 100K HRC: 32-48
Brand Name: none Product: homeholds mould Runner: hot or cold Payments item: half and half
Model Number: EHMH15 Name: vertical plastic injection molding machine Software: Pro-E, UG, regular worker, CAD T1 time: 30days after drawing confirmed
Shaping Mode: Plastic Injection Mould Other name: household mold type, chair, container, fox Mold base: LKM, ODM Guaranty: 1 year

 

Packaging Delivery

Packaging Details Wooden carton
Delivery Details 35-45 DAYS

 

vertical plastic injection molding machine

Product Description

Specifications of vertical plastic injection molding machine:

mould material 45#, P20, H13, 718, 2738, NAK80, S136 etc.
mould base LKM, HASCO etc.
Cavity Single/multi
Mould life P20: 300,000-500,000 shots    2316 718H: 500,000 shots     S136 H13: 700,000 shots
Design software UG, PROE, CAD etc.
Plastic material PP, PE, ABS, PC etc.
Delivery time 35-45 days
Specification According to client’s requirements

1. Samples/drawing&requirement from you

2. Mould design: we will communicate and exchange the opinion with you after you place order.

3. Material Purchase: Steel cutting and mould base tooling.

4. Assembling.

5. Inspection of mould: following and controlling the tooling processing.

6. Mould testing: We will inform you the date. Then will send the sample’s inspection report and injection parameters with the sample to you!

7. Your instruction&confirmation for shipment.

8. Ready-made mould before packing.

Package of injection molding:

1. Wooden carton,

2. shipping by sea, by load,

3. We also can produce any plastic parts for you. We have 25 different ton injection machines.

Pictures of vertical plastic injection molding machine:

67

8

Company Information

1. Office corner

办公室

2. Equipment

 EquipmentsEquipments

3. Working place

 

 

Working-place

4. Package and delivering

package-and-delivering

5. Certification

1-61-71-81-91-9

6. Our customers

 

 

1-10

FAQ

Why choose us?

Prompt response in 24 hours
Good Quality
Reasonable price
Stronger engineer team Support R&D
Good After-sale service

 

 

How about your payments item?
Payment Item: 50% deposit after confirming the drawings and 50% balance after confirming the samples (before delivery).

 

Delivering time?
Generally, T1 time is 30 days after drawings confirmed both side, then the samples approved, 5 days later it can be delivering.

 

Ability of producing?
We have all tooling machine for making molds. We can provide 30-50 sets of molds every month.

 

Welcome to visit us!

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405




  • Visit https://www.smarthvacproducts.com/product/reusable-solder-putty to learn more.

    Cool Blue Reusable Solder Putty stops the transfer of heat when soldering joints, copper fittings and valves. The putty is reusable for life and is able to stop heat transfer of over 3000° F within less than an inch. It protects heat sensitive areas such as rubber hoses, fittings, ball valves, condensing valves, plastic to copper transition and painted surfaces. When done using, simply place it back in the jar and use it again as needed . A 1lb jar should last a lifetime.

    Cool Blue Reusable Solder PuttyFeatures & Benefits:

    More effective than wet rags
    Cuts down heat up to 3000 °F from 1/2″ away
    100% reusable for life
    Rejuvenated with water
    Eliminates costly repair, tear downs & replacement of parts
    Can be used upside down
    Non toxic and biodegradable



    The current status of my corolla CE, after I posted the video back in 2013 about installing my radio and some leds. I’ve done many things since then:

    NOT shown on video: •Megan Racing lower middle bar. •Ultra Racing rear strut bar

    •TRD Front strut bar
    •OEM rear bumper cover
    •LEDs everywhere replacing the yellow bulbs, including shift selector and those in rear view mirror.
    •Dash cover
    • Window visors
    •Full THULE roof rack
    •Corolla LE Chrome accents (e-brake & A/C vent tips)
    •Corolla LE dual compartment arm rest (from a 2003 LE)
    •Chrome door handles (will buy OEM ones soon)
    •Corolla LE/S tweeters & tweeter covers (from a 2004 LE)
    •2005-2008 Corolla LE cluster (from a 2005)
    •Corolla LE woodgrain console and switches (from a 2007)
    •Corolla LE/S rear view mirror (from a 2005 LE)
    •Intermitent wiper switch (from a 2004 LE)
    •eBay foglight kit (holding up good until now)
    •Hikaru 6000k HIDs on fogs and low beams.
    •Still rocking the blue halogen bulbs on the high beams, the same ones from the 2013 video.
    •Sickspeed black socks on PS and brake reservoirs and intake mani (for looks)
    •Engine cover is from a 2002 celica, with Synth Oil only (car has been synthetic since 100k miles, it has 130k)
    •Big 3 Upgrade
    •Fumoto valve for easier oil changes
    •Alternator, starter, engine mounts, cv and ball joints, and exhaust maintenance has been done.
    •AEM drop in filter
    •Pyle alarm with starter disable and trunk opener.
    •Steering wheel toyota logo replaced since it was scratched.
    •TRD seat belt covers (Given to me for free by a friend, another toyota enthusiast)

    Plans:

    •03-04 1ZZ-FE supercharger (will take some hunting to do)
    •DC sports headers w/ Magnaflow high flow converter.
    •2ZZ water pump
    •MWR water pump and alternator pulleys.
    •Lightweight crankshaft pulley (1ZZ engine is internally balanced, no need for heavy stock pulley.)
    •Tokico Blue shocks or KYB shocks.
    •Poly bushings in control arm and rear axle beam.
    •I already have Tein H tech springs I haven’t installed yet.
    •I have 2005 Celica GT-S wheels I will be installing soon.

    May 17-23, 2017: repainted my rear bumper with spray can, and last using rust oleum clear coat, pretty amazed for a spraycan job, bumper was dull and scratched.

    ° All of the things I mentioned on the car, done by myself completely.

    Related Products

    WhatsApp Online Chat !