26 Years Factory tpu injection molding Factory in Cologne

26 Years Factory
 tpu injection molding Factory in Cologne

Short Description:


Product Detail

Valve factory

Injection mold factory

Extrusion factory

Product Tags

We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective. To perfect our service, we provide the products with the good quality at the reasonable price for 26 Years Factory tpu injection molding Factory in Cologne, we are looking forward to even greater cooperation with overseas customers based on mutual benefits. Please feel free to contact us for more detail


Quick Details

Place of Origin: Zhejiang, China (Mainland) Product Material: P20H ,718H, 2316 ,Nak80 ,S136 Mold life: 30K,50K,100K HRC: 32-48
Brand Name: none Product: auto parts mould Runner: hot or cold Payments item: half and half
Model Number: EHM14 Name:tpu injection molding
Solfware: Pro-E, UG, solide worker, CAD T1 time: 30days after drawing confirmed with both side
Shaping Mode: Plastic Injection Mould Other name: injection molding , mold dies , plastic mold machine
Mold base: LKM, ODM Guaranty: 1 year

Packaging Delivery

Packaging Details: tpu injection molding  packing: Wooden carton
Delivery Detail: 35-45 DAYS

tpu injection molding

Product Description

Specifications of  tpu injection molding:

mould material 45#,P20,H13,718,2738,NAK80,S136 etc.
mould base LKM,HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould life P20:300,000-500,000 shots
2316 718H:500,000 shots
S136 H13:700,000 shots
Design software UG,PROE,CAD etc.
Plastic material PP,PE,ABS,PC etc.
Delivery time 35-45days
Specification According to client’s requirements

1.Samples/Drawing &Requirement from you

2.Mould design:we will Communicate&Exchange the opinion with you after you place order.

3.Material Purchase:Steel cutting and Mould base tooling.

4.Assembling.

5.Inspection of mould : following and controlling the tooling processing.

6.Mould testing:We will inform you the date.Than will send the sample’s inspection report&injection parameters with the sample to you!

7.Your instruction &confirmation for shipment.

8.Ready made mould before packing.

Package of  injection molding :

1. Wooden carton ,

2. shipping by sea ,by load ,

3. We also can produce any plastic parts for you . We have 25 different ton injection machine .

Pictures of tpu injection molding:

A (143) A (142) A (141) A (140)

Company Information

1.  Office corner
office corner

2.  Equipments
Equipments
3.Working place

Working place

4.  Package and delivering
package and delivering

5. Certification

俄罗斯认证证书 (1) WRAS ISO14001 ISO9001

6. Our customer
Our customer

 

FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service

1. How about your payments item ?
Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery).
2. Delivering time ?
Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering .
3. Ability of producing ?
We have all tooling machine for making molds, we can provide 30-50 sets of molds every month .

tpu injection molding

  • Previous:
  • Next:
  • 1.  Office corner
    bgshj
    2.  Producing and inspection
    scjc
    3.  Package and delivering
    bzfy

    4 . Certification
    els WRAS ISO14001 ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments Working place

    3.  Package and delivering
    package and delivering

    4 . Certification

    俄罗斯认证证书 (1) WRAS ISO14001ISO9001微信图片_20190225131405

    1.  Office corner
    office corner

    2.  Producing and inspection
    Equipments

    3.  Package and delivering
    Producing & delivering

    4 . Certification

    1-6WRAS ISO14001 ISO9001微信图片_20190225131405




  • [https://www.nirmitpolymer.net/ ] Established in the year 2013, Nirmit Polymer Pvt. Ltd, is a distinguished manufacturers of Plastic Ball Valve, Plastic Foot Valve, Plastic Non Return Valve, Plastic Repair Saddle etc . Our long journey in the industry has helped us in associating ourselves with some of the key market players like Grasim Gears, Vinayak Enterprises & Excel Industries and we are a reputed member of the Small Scale Industries (SSI) also.



    This is a brief tutorial on how to properly operate the 3 way valve on a Headhunter sewage treatment system. Please contact us for further tech help, parts sales and service. Thanks

    Related Products

    WhatsApp Online Chat !